SeongHee Yang

Senior Mechanical Engineer
Dongrae Gu,Pusan City

Summary

- Possess strong relationship management, teamwork, influencing, and communication skills which I utilize to develop and maintain motivating work environments, resulting in high performing teams.

- Familiar with execution, coordination, managing, procure and troubleshooting on Major oil and gas project

- I have varied experience leading major construction projection and have worked in Oil & gas, and Data center

Overview

14
14
years of professional experience
8
8
years of post-secondary education

Work History

Lead Mechanical Engineer

KT(Korea Telecom)
Pusan, Pusan, Korea
02.2021 - Current
  • Lead Mechanical construction and commissioning for Microsoft data center(PUS04 Project)
  • Create and execute construction and commissioning plans and test procedure.
  • Managing the cost, Scope and mile stones for all mechanical relevant work scopes.
  • Diagnostic installation and completion status of mechanical equipment and all auxiliaries.
  • Responsible of Factory Acceptance Test(FAT), Mechanical Completion(MC) for rotating equipment, HAVC Equipment and Fire-fighting system.
  • Provided Trouble shooting solutions for mechanical packages.
  • Leading the local construction team to deliver work targets based on project schedule.
  • Managing the several sub-contractor companies and design company to derive results suitable for project specification.
  • Performed risk management analyses of proposed installations to mitigate both internal and customer liabilities.

Construction TFT Manager

DSME
Geoje city, Gyoungsangnamdo, Korea
10.2018 - 10.2020
  • Identified issues, analyzed information and provided solutions to problems.
  • Delivered services to customer locations within specific timeframes.
  • Worked within applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Actively listened to customers, handled concerns quickly and escalated major issues to supervisor.
  • Manager of the Tiger team as involve to CPI(Client providing Item) Punch items killing / Plan day and future Maintenance functions, prioritizing work, Interfaces with other all disciplines and organizing resources
  • Handle the all available resources for fast tracking in order to hand over system completion
  • Take site survey aggressively in order to providing diagnostic and solution for clear defects.
  • Tracking down service material, replacement, shipping record with project CPI engineer.

Mechanical Commissioning Engineer

Statoil
Ulsan, Ulsan, Korea
02.2017 - 09.2017
  • Analyzed, troubleshooting software problems and communicated possible solutions with development team.
  • Coordinated with technical liaisons and construction team members to address technical issues for meeting project requirements.
  • Coordinated industrial control system activities with consultants to guarantee fulfillment of necessary jobs on time.
  • Obtained licenses to secure access to Testing and Commissioning Sites within [Location] region.
  • Preparation & execution commissioning for following system; EMDG, ESDG, Fire water generator, Fuel storage and distribution system, Condensate storage and offloading system, Condensate offloading hose reel and other related hydraulic equipment.
  • Confirmed healthy of piping & mechanical systems which it wired with Integrated Automation system and Integrated Computer system (a kind of SCADA system on the platform).
  • Conducted Multi discipline certification Inspection in order to hand over from Construction to commissioning.

Commissioning Leader

Mitsubishi
Nagasaki, Kyoshu, Japan
03.2015 - 02.2017

- As working a Lead Commissioning Engineer for Hull & Accommodation commissioning

- Leading the commissioning technicians to clear all work scopes

- Confirmed healthy of piping & mechanical systems which it wired with Integrated Automation system and Integrated Computer system (a kind of SCADA system on the platform).

- Confirmed all functional things are working in normal according to commissioning procedure.

- Leading the all commissioning works with MHI Japanese co-workers and other third parties

- Plan, execution and report of all work activities as according to priority, schedule and commissioning procedure

- Inspected & Preservation every mechanical equipment which we have in-charged to completion system for M.C and pre-commissioning

- Report to Commissioning manager based on daily progress

Commissioning Engineer

Exxon-Mobil
Sakhalin(OFFSHORE), Sahalin, Russia
07.2014 - 11.2014

- As working for Commissioning Engineer & Lead Supervisor

- Provide supervision to Halliburton’s Leak Test Team

- N2 & Helium Leak test supervision and execution for offshore leak test packages on process systems.

- Reviewing the leak test pack and test execution for whole process systems, winterization steam system, Temporary living quarter water lines and fuel gas system

- Flow-up the spare parts, repair status, schedules of leak test package for start-up

- Offshore commissioning execution & preparation of instrument, mechanic and piping

- Leading the technicians to hand over all commissioning activities to start-up team

- Performance test for static equipment and winterization equipment

- TLQ(Temporary Living Quarter) preparation and commissioning

Commissioning Engneer

Exxon-Mobil
Geoje city, Gyoungsangnamdo
08.2012 - 07.2014

- Provided supervision to people keep working safety always.

- Review and analysis Field change order (FCO) and NCRs processing for all commissioning activities (Included purchasing process).

- Providing resources if required after review the FCO or NCRs

- Generate Red line DWGs with Engineering team and also produce correct action by execution team(Tiger team)

- Generating Commissioning procedure & DWGs for Production transfer, Chemical Injection, Diesel

Transfer, Hoists & Trolley, Base oil, Rescue Equipment, Pedestal Crane, Sewage Treatment, Wellhead HPU

Systems, update and review in early commissioning phase.

- Review Job description, prepared all materials for offshore commissioning and start-up.

- Manager of the Tiger team(Construction fast-tracking task force team) as involve to M.C completion (All disciplines) & Commissioning support / Plan day and future Maintenance functions, prioritizing work, Interfaces with other all disciplines and organizing resources.

- Handle the all available resources for fast tracking in order to hand over system completion.

- Prepared material for close urgent items which is higher priority ones with strong relationship with local vendors.

- Generating of System boundary (SB) drawing (Process & Utility systems).

- Review of System boundary drawing with Turnover and Completion Package.

- Analysis the Field change order (FCO) processing and providing solution.

- Involved whole mechanical material, test equipment, consumable and also other resources for offshore start-

up preparation.

Service Engineer

Rolls-Royce
Gangseogu, Pusan city
05.2011 - 08.2012

- Worked as Service engineer and supervisor belong to Rolls-Royce marine.

- Provided technical services, visual & performance inspection and diagnostic for Electro-Hydraulic equipment’s commissioning & Start-up.

- Maintenance & Trouble shooting for Electrical, Instrument and Mechanical equipment.

- Provided supervision to Ship yard staffs to prepare and execute pre-commissioning and commissioning.

- Report to branch and main offices about all progress, problems and maintenance condition according to internal regulation.

- Covered all of ship yards in South Korea (travelling every day to meet people who needed me and our services).

- Local survey and planning to solution for clear defects.

- Prepared material for close urgent items which is higher priority ones with strong relationship with local vendors.

- Communicate with Norway office for resolve engineering problems, material deliver plan, project budget estimation and reporting all issues what we need to carried out.

Mechanical Commissioning Engineer

DSME
Geoje city, Gyoungsangnamdo
06.2006 - 05.2011

- Totally Involved 9 of oil and gas project as working for yard staff mechanical engineer(FPSO, Fixed Platform, Semi-rigs).

- Involved as Mechanical static and rotating equipment and piping construction and system completion.

- Mainly performed trouble shooting and fast tracking management for system hand over between Construction and commissioning (working as a bridge interface within MC to Comm’g).

- Execute and coordinate commissioning performance test on local function and Integrated Automation system

- Handling the whole FAT Punch items for Fast tracking & on time delivery.

- Track down the Project Completion System (; PCS; project status tracking system in DSME) to provide scheduling, prioritizing.

- Involved Field inspection for confirm revised & resolved defects on the mechanical system.

- Prioritizing mechanical defects according to project completion schedule.

- Focused on integrated system completion with other departments and third parties.

Education

Bachelor of Science - Radiologic Technology

Kaya University
Gimhae, Korea
03.2002 - 02.2010

Skills

Construction & Commissioning

undefined

Timeline

Lead Mechanical Engineer

KT(Korea Telecom)
02.2021 - Current

Construction TFT Manager

DSME
10.2018 - 10.2020

Mechanical Commissioning Engineer

Statoil
02.2017 - 09.2017

Commissioning Leader

Mitsubishi
03.2015 - 02.2017

Commissioning Engineer

Exxon-Mobil
07.2014 - 11.2014

Commissioning Engneer

Exxon-Mobil
08.2012 - 07.2014

Service Engineer

Rolls-Royce
05.2011 - 08.2012

Mechanical Commissioning Engineer

DSME
06.2006 - 05.2011

Bachelor of Science - Radiologic Technology

Kaya University
03.2002 - 02.2010
SeongHee YangSenior Mechanical Engineer