- Planned and managed the schedule for electrical -manufacturing
- Selection of cables based on the power capacity required for the equipment
- Established a layout for an efficient manufacturing space
- Managed subcontractor workloads to achieve efficient labor costs
- Managed and provided the supplied electrical parts
- Solved electrical issue to ensure smooth manufacturing schedules at the manufacturing plant and customer sites
- Checked motor torque and drive test (Align, Lift pin, VVC Motor)
- Proceeded communication setup, heater warm-up test
- Checked vacuum performance and leak rate
- Evaluated performance of APC v/v based on gas flow rate and set pressure
- Evaluated the actual flow rate of MFC
- Proceeded plasma and ESC test (RF power, He flow rate, Leakage current check)
- Verification of conditions and interlock for user safety and operation (Motor, heater, plasma, gas, pumping)
- Checked wiring of the designed electrical schematic and provided feedback
- Inspected quality of electrical rack
- Created parts setting procedure (Sensor, meter, controller, etc.)
- Created materials for educating on electrical-related knowledge
- Experienced various inspections such as safety inspections and electrical inspection (SDC)
- Conducted modifications and maintenance on equipment delivered to clients at the request of the customer support team
- Constructed the electrical rack and completed the wiring
- Designed power rack that can provide power to components (RFG, Dry pump, Cryo pump, Turbo pump, Motor, Blower)
- Designed the layout diagram for the electrical rack
- Designed a triple (or dual) defense safety circuit for the heater (ELCB, MC, SSR(SCR))
- EMS, Robot, Servo motor
20.04 ~ current _ Dry Etcher 6G/H6G (SDC, BOE, CSOT, TIANMA, HKC, GVO)
24.04 ~ 24.08 _ Dry Etcher 8.6G (SDC)
22.01 ~ 22.12 _ Remote Plasma Ashing (SDC)
21.02 ~ 21.07 _ Laser etcher VTS (SDC)
20.08 ~ 20.12 _ Laser drilling VTS (SDC)
16.04 ~ 20.03 _ Evaporator, Sputter, Furnace (SAIT, BOE, Apple, Skyworks, LGD)