With over 35 years of experience in the electrical sector, including 26 years in nuclear power plants and 9 years specializing in the APR1400 (BNPP), I am confident in my capacity to make a substantial contribution to your organization. My expertise is centered on ensuring the safe and stable operation of nuclear power plants through effective maintenance practices and problem-solving strategies.
As an LTMSA contractor at BNPP for 3 years (KEPCO KPS, August 2022 – December 2024) and as an electrical engineer for the CP-S2 segment of the BNPP project for 7 years (KEPCO KPS, November 2015 – July 2022), I have significantly contributed to the ENEC electrical maintenance team. My responsibilities included executing work orders, reviewing maintenance procedures, resolving field issues, and collaborating with colleagues to devise effective solutions. These efforts ensured the stable operation of the ENEC electrical maintenance team.
I previously held a position at the Gori Nuclear Power Plant in South Korea for 26 years (KEPCO KPS, December 1989 - November 2015). During this period, I developed significant expertise in maintenance operations, which included the revision of procedures and the execution of fuel reload shutdowns, in addition to online activities. With over 20 outage experiences across various NPPs and comprehensive involvement in PM and CM activities, I have fostered a profound understanding of APR1400 operations, thereby enhancing their safety and stability.
I am enthusiastic about the opportunity to apply my skills within your organization and support the stable operation and growth of your nuclear facilities. The previously discussed salary, about 28,000 AED would provide essential financial stability for my family and further enhance my dedication to your team. As I continue to enhance my English proficiency, I am confident that my technical expertise and comprehensive understanding of the worksite will enable me to make a substantial impact. I look forward to discussing how my experience aligns with your organizational needs and how I can contribute to your organization.
Thank you for considering my application.
Sincerely, Jongsoo Kim
Organization & Team : BNPP U1&2, Electrical Maintenance Team
- Electrical Safety Work (Procedure: HNS-PRC-0111)
- Temporary Grounding (Procedure: 1N2-MNT-EM-GD-0001)
- Member of Emergency Respond Organization
- Approved JQC/TQC from Nawah Energy Company
▶ Managed the status of batteries and guaranteed environments to operate it in conditions
- Reviewed and peer-checked the trace or crack on the surface of battery cells
- Subjected the test of periodic/surveillance
▶ Performed BATTERY TEST
- Conducted the Battery Discharge Test
- Conducted Class 1E Battery duty cycle Capacity Test
▶ BNPP - 841,842 SYSTEM
- Troubleshooting an issue where the charger outputs irregular waves compared whit normal
- Troubleshooting an issue where the Inverter outputs irregular waves compared whit normal
- Troubleshooting the ground alarm where the system was grounded by leak of cable
▶ Performed CHARGER CAPACITY TEST
- Conducted Class 1E Charger Capacity Test
▶ Performed the EDG TEST
- EDG & ESPS TEST
▶ Performed the Troubleshooting
- Troubleshooting an issue where the power hunting outputs irregular waves compared whit normal
- Troubleshooting an issue where the MPU Outputs irregular waves compared whit normal
- Trouble Alarm and Disable Alarm Inspection and Repair
- Troubleshooting an issue where the GOVERNOR OIL LEVEL dropping while whit abnormal
▶ Performed Replacement of CW Pump Motors, ESW Motors, SWBP Motors, etc
- Safety Ground Truck Installation and Removal at BNPP
- Established Lifting plan for Large Motors and Heavy Items
- Disassembly and Assembly of Large Motors and No-load Test and Load Test
▶ Performed Motor Control Logic Inspection for HVAC, CWP, SWBP, etc
- Trouble Alarm and Disable Alarm Inspection and Repair
- Starting Logic inspection and repair
▶ Performed Replacement of MOV’s Control Limit Switch Ass’y for Enertork, AUMA and Limitorque type Actuators
- Disconnection and connection of MOV control cables and power cables
- Replacement of control switch assembly and torque switch
- Resetting Geared Limit Switch and Inspection of Torque switches
▶ Performed Disassembly and Assembly of MOV’s Potentio Meter and R/I Converter
- Class 1E Limitorque Actuator Potentio Meter replacement and Adjustment
- Non Class 1E Enertork Actuator R/I Converter replacement and Adjustment
▶ Performed the MOV Control Circuit Inspection
- Control Circuit Inspection on Trouble Alarm and Disable Alarm and Repair
▶ Performed Inspection and Repair for Load Center, SWGR, MCC, DC MCC, GCB
- Trouble Alarm and Disable Alarm Logic Inspection and Repair
- Electrical inspection and Mechanism Inspection for SWGR and LC
- Conducted the Operation Test of Circuit BKR
- Conducted the Electric Out-tage Work for SWGR, LC,MC in BNPP Unit 1&2
- Conducted the Preventive Maintenance of GCB and Long-term Preservation
▶ Performed Surveillance Test and Periodic Test
- PZR Heater Capacity Test
- Class 1E HVAC System and Hydrogen Ignitor Operability Test
- Class 1E UPS Battery Capacity Test
▶ Performed the Control Logic Inspection and Repair for Heater Tracing PL, HVAC, PZR HTR, ESW, CCW, CW Debris filter, Condenser Ball Cleaning System, Intake Screen Wash System and Trash Rack Rake System
- Replacement and adjustment of the trash rack rake control limit switches and cam switches
- Inspection of control circuit on each auxiliary system
▶ Performed Maintenance Work for Chlorination Production Equipment, Water Treatment Facility, Sump Motors and Aerators
- Replacement of aerators
- Disassembly and assembly inspection of chlorination cell box
Organization & Team : KORI U1&2, Electrical Maintenance Team
▶ Performed Replacement of RCP Pump Motors, ESW Motors, CC PUMP Motors, etc
- Disassembly and Assembly of Large Motors and No-load Test and Load Test
▶ Performed Motor Control Logic Inspection for chiller, pump, etc
- Trouble Alarm and Disable Alarm Inspection and Repair
- Starting Logic inspection and repair
▶ Performed Inspection and Repair for Load Center, SWGR, MCC, DC MCC, GCB
- Trouble Alarm and Disable Alarm Logic Inspection and Repair
- Electrical inspection and Mechanism Inspection for SWGR and LC
- Conducted the Operation Test of Circuit BKR
- Conducted the Electric Out-tage Work for SWGR, LC,MC in BNPP Unit 1&2
- Conducted the Preventive Maintenance of GCB and Long-term Preservation
▶ Performed Inspection and Repair for DC Load Center, CHARGER,UPS,INVERTER
- Trouble Alarm and Disable Alarm Logic Inspection and Repair
Classification, Name of Contract, Period(Start-End)
Course, Institution, Period(Start-End)
License / Certificate, Issued by, Date of Issue