I am a civil engineer with 1 year and 6 months of experience in the development and design of construction projects and on-site management at the industrial water pipe rehabilitation project site. Although it is not a long career, during the construction period, I was adopted as an excellent site in 2023 in compliance with not only the construction field but also the safety field and quality based on risk assessment. In particular, despite the difficult site conditions, I have experience in successfully carrying out the construction by saving 10% of the cost and conducting smooth construction within the existing budget through constant field investigation and adoption of effective and reasonable construction methods.
1. Total length of Extension(L) = 13.17km (pipeline renewal = 9.3km, Install new pipeline = 3.2km)]
2. Valve & Valve Room Repair 138 locations
3. Drainage Facilities Duallised 7 locations.