Overview
Work History
Skills
Timeline
Generic

YooNam Nam

Quality Specialist, Aero-plane/Helecopter
Gimhae city

Overview

48
48
years of professional experience

Work History

Source Inspection Support

Verify Europe Limited
05.2025 - Current
  • Responsible for source inspection support of suppliers’ products for the customer
  • 1) Elmet International/Elbit System Land Ltd - Romania
  • (1) ROKADI Co., Ltd. / Gangseo-gu, Busan, S. Korea
  • (2) Daesung Hi-Tech Co., Ltd. / Hyeonpung Daegu, S. Korea
  • Various types of military weapon parts

Vendor Surveillance Corporation/Verify Inc.
03.2002 - Current

Supplier Quality Specialist

Verify Inc.
10.2020 - 04.2025
  • Responsible for First Article Inspection activities, and Source Inspection Control activities of suppliers’ and their sub-tier vendors’ products for the customer.
  • (1) HIZE AERO Co., Ltd. / Busan and Jinju city, S. Korea (supplier name/address)
  • B737 Sheet Metal Details and Sub-Assembly, Rudder

Spirit AeroSystems Inc.
03.2015 - 09.2020
  • (1) Aerospace Technology of Korea / Global Inc. / Sacheon city, S. Korea
  • B737/747/767/787 Section 48 AFT Body Assembly, Sub-assembly and Sheet Metal Details
  • (2) ORBITECH Co., Ltd. / Haman- Gun S. Korea
  • B767/787 SMP (Sheet Metal Parts), Sub-assembly
  • (3) DAEHWA Aerospace Ind. Co., Ltd. / Goseong Gun, S. Korea
  • B787 Sheet Metal Details, Sub-assembly
  • (4) Sacheon Aerospace Manufacturing Ind. Co., Ltd. / Sacheon city, S. Korea
  • B737, B777, B787, BR725 Sub-assembly and Sheet Metal details
  • (5) YULKOK Ltd. / Sacheon city, S. Korea
  • B737 Machined Frames, B787 Machined Frames
  • (6) Leading Aero Company / Sacheon city, S. Korea
  • B777, 787 Sheet Metal Details, Machined Frames
  • (7) Kencoa Aerospace / Sacheon city, S. Korea
  • B737, 747,767, 777/787 Sheet Metal Details, Machined Frames30.
  • (8) HIZE AERO Co., Ltd. / Busan and Jinju city, S. Korea (supplier name/address)
  • B747,787 Sheet Metal Details and Sub-Assembly

Triumph Aeostructures / Vought Aircraft Ind., Inc. and V.A Division Program
02.2002 - 04.2015
  • (1) Korea Aerospace Ind. Ltd. and sub-tier suppliers / Sacheon city, S. Korea
  • B737 Inboard Skin Formed
  • B747 AFA Frame Assembly, Floor Panel Assembly, Machined/Formed Stringer, Details (Shear ties, Stringer Clips, Shims, Fillers)
  • Soosung Airframe Ind., Ltd / Haman-gun, Gyeongnam, S. Korea (Sub-tier vendor name/address)
  • GA (Gyeongnam Aerospace) Ind., Ltd. / Sacheon city, S. Korea (Sub-tier vendor name/address)
  • B767 D6-1276 Designated Forged Parts/Kits, Section 48 Upper Panel Assembly, Fixed Trailing Composite Bonding/ Assembly, Wing Center Section Sheet Metal Details (Shear Ties, Stringer Clips), Pressure Dome Kits.
  • Turbo CAM Technology / Changwon city, Korea (Sub-tier vendor name/address)
  • Dae Shin Aerospace Co. /Sacheon city, Korea (Sub tier vendor name/address)
  • DOHA Industries Co. /Gimhae city, Korea (Sub-tier vendor name/address)
  • DACC Custom Composites / Wanju-gun Jeonbuk-do Korea (Sub-tier vendor name/address)
  • Gulf Stream, G-V Landing Light Assembly, Navigation Light Assembly
  • SAT (Sewoo Aerospace Tubing Co. / Sacheon city, Korea (Sub tier vendor name/address)
  • (2) Korean Air Aerospace Division, Busan, Korea - Supplier Name
  • B747/757 High Frequency Antenna Rib, Bonded parts
  • Oriental Aerospace Co., Ansung Gyeongi-do, S. Korea (Sub-tier vendor name/address)
  • B767 Section 48 AFT Body Assembly and Details, D6-1276 Designated Parts/Kits
  • (3) ShinMaya Industries, Ltd, Kobe and Tokushima, Japan
  • B747 Plow Share Assembly, Boat Rib Assembly (Kobe)
  • Gulf Stream, G-V Fixed Trailing Edge Composite Assembly, Main Landing Gear Composite Assembly, WTB Fairing Composite Assembly (Kobe)
  • Gulf Stream, G-V Aileron Composite Assembly, Spoiler composite Assembly, Flap composite Assembly (Tokushima)
  • (4) Hyune Aero-Specialty Inc. / Busan city, S. Korea
  • B747 Sheet Metal Details (Shear-ties, Stringer clips, Shims).
  • (5) Asiana Aviation, Seoul city, S. Korea
  • B757 High Frequency Antenna Rib, Bonded parts
  • Oriental Aerospace Co., Ansung city Gyeongi-do S. Korea (Sub-tier vendor)

International Task Force
05.1998 - 02.2002

Quality Engineer

International Task Force
05.1998 - 02.2002
  • Responsible for First Article, source, MRB / CA activities of the supplier’s and sub-tier vendor’s products for the customer.
  • 1) Northrop Grumman Commercial Program
  • (1) Daewoo Heavy Industries, Changwon City, S. Korea - Supplier Name
  • B747 AFA Frame Assembly (Section 4230, 4625, 4655, 4663, 6230, 6260, 6430)
  • Sam Heung Precision Co., Ltd. / Changwon city, S. Korea (Sub-tier vendor)
  • B747 Details (Shear ties, Stringer Clips, Shims, Fillers)
  • Gulf-Stream, G-IV Stang Beam Assembly, Engine Mounts
  • A330/340 Machined Stringers
  • Young Jin Ind., Co. / Haman-gun Gyeongnam, S. Korea (Sub-tier vendor)
  • Dongjin Machinery / Woosung Aerospace Co. /Changwon city, S. Korea (Sub-tier vendor)

Quality Inspector/Production Supervisor

Korean Air Aerospace Division
04.1994 - 04.1998
  • Responsible for product control activities related to in-process and final assembly for main-wing Assembly and Horizontal Assembly, composite on KF-16 Korean Fighter Aircraft
  • 1) Production Supervisor
  • 2) Quality Assurance Inspector
  • Responsible for sub-assembly, final assembly for Boeing, McDonnell Douglas, Airbus, Northrop, Hawk De Havilland, Korea Telecom, and Hughes Helicopter Programs.
  • Duties included depot maintenance inspection for 500MD/D for the Korean Military/Commercial Helicopter, US Military Aircraft Maintenance parts inspection for fabrication, welding, heat treatments.
  • B747: Flap Track Fairing Composite Assembly, Wing Tip Extension Assembly
  • MD-80/90: Sheet Metal Assembly
  • MD-11: Spoiler Bonded Assembly, Fillet Bonded Panel, Mid-Fan Cowl Assembly.
  • A330/340, Section 15: Floor Structure Assembly, Machined Stringers
  • Hawker De Havilland, Australia: Nose cap Details
  • Northrop Target Drone Assembly, RPV Assembly
  • 500MD/D: Korean Military/Commercial Helicopter

Aeronca Fleet
08.1988 - 12.1988
  • Responsible for FAI control activities of the first produced part, MD-11 Fillet Composite Panels QA Representative, including FAA conformity inspection support.

Boeing
06.1988 - 06.1988
  • Visited Boeing to do Fit up Check for the First Article, B747-400 Flap Track Fairing Assembly as QA inspector.

Korean Air, Aerospace Division
12.1977 - 04.1988

Helicopter Assembly Mechanic

12.1977 - 03.1981
  • Airframe general mechanic, and sub-assembly, structure assembler for 500MD/D Korean Military/Commercial Helicopter

Skills

Documentation review for First Article Products and Mass products including shipping and packing

Timeline

Source Inspection Support

Verify Europe Limited
05.2025 - Current

Supplier Quality Specialist

Verify Inc.
10.2020 - 04.2025

Spirit AeroSystems Inc.
03.2015 - 09.2020

Vendor Surveillance Corporation/Verify Inc.
03.2002 - Current

Triumph Aeostructures / Vought Aircraft Ind., Inc. and V.A Division Program
02.2002 - 04.2015

International Task Force
05.1998 - 02.2002

Quality Engineer

International Task Force
05.1998 - 02.2002

Quality Inspector/Production Supervisor

Korean Air Aerospace Division
04.1994 - 04.1998

Aeronca Fleet
08.1988 - 12.1988

Boeing
06.1988 - 06.1988

Korean Air, Aerospace Division
12.1977 - 04.1988

Helicopter Assembly Mechanic

12.1977 - 03.1981
YooNam NamQuality Specialist, Aero-plane/Helecopter